Skip to content

Projects & Blogs

Projects

Royal Liverpool University Hospital – Liverpool

Following Laing O’Rourke taking over completion of a former Carillion project to construct the new Royal Liverpool University Hospital it was found that fire protection previously installed by other contractors did not comply with regulations.
View Details

Staybridge Suites – Newcastle

Following a fire strategy survey of this hotel in the centre of Newcastle, it was found the the service penetrations at all levels needed upgrading to bring in line with current regulations.
View Details

The Bristol Hotel – Bristol

Following a fire strategy survey of this hotel it was found that compartmentation to the basement and ground floor needed upgrading to bring in line with current regulations.
View Details

Harrods

With plans for Harrods to completely revamp it’s Beauty Hall offering, Fire Barrier Services was tasked with providing remedial fire stopping works to update the current offering and provide 120 minutes fire protection.
View Details

Harbour Exchange

Engaged as principal contractor, Fire Barrier Services were employed to undertake essential maintenance throughout both buildings at Harbour Exchange, Towers 1 & 2 in the heart of the Docklands, London.
View Details

Bombay Sapphire Distillery

Following a safety survey of this historic building, now home of the world famous Bombay Sapphire Gin Distillery, it was found that service penetrations through compartments walls and floors were not compliant with fire regulations.
View Details

News & Blogs

New role opportunity: Contracts Manager

Fire Barrier Services is one of the UK’s leading passive fire protection contractors. With a reputation for trust and delivery, we pride ourselves on our integrity. Due to continued expansion
View Details

Why Injectaclad | The problem

In order to determine whether the external wall system is ‘safe’, it will be necessary to assess the nature of the materials comprising the external wall and the state of
View Details

Why Injectaclad | The product

The Injectaclad product is a retrospectively installed cavity barrier designed to reinstate the fire resistance performance of rigid and flexible wall and floor constructions using the patented Injectaclad product and process.
View Details

Why we need Injectaclad | The reason

Injectaclad can reinstate a buildings reinstate the fire resistance performance of wall and floor construction cavity details, where linear gaps are present within hidden voids that can allow fire and smoke to pass through from one compartment to another.
View Details

Why Injectaclad | The environmental benefits

From an environmental prospective if the external façade of a building is removed the volume of waste material generated is significant as are the levels of dust and debris. Whilst some of the façade may be recycled such as brick / blockwork
View Details

Why Injectaclad | The benefits to building owners & occupiers

Injectaclad provides a cost effective solution to a significant safety issue and gives peace of mind to building owners and occupiers by retrospectively reinstating the fire resistance performance of cavity
View Details

We are committed to providing total customer satisfaction and building long term relationships.

CALL US TODAY ON: 0333 355 1972